Skip to Content, Navigation, or Footer.
Logo of The Mercer Cluster
Saturday, Apr 20, 2024
Interested in Working for the Cluster? Ask about joining our Discord!

Moye football complex is ready for the first game

The new stadium for football is absolutely amazing. I went exploring there the other day, and was awestruck by the immensity of the stadium. Seeing the finished product is awesome because I watched it built from the ground up. It didn’t take Mercer long at all to get the stadium up and running.

In my explorations of the newly finished stadium, I noticed the artifical-turf field (painted with the Mercer emblem in bright orange and contrasting black). The turf is soft and kind of springy to step on (you should try a few jumping jacks of excitement when you step out on it).

The bleachers themselves are gigantic! The top of the bleachers are so high, you get a great view of the entire field.

I discovered the concession stand just outside the stadium facing the engineering building. The concession stand hopefully will have no problem accommodating the thousands of people expected to be at the game.

I can imagine the crowd that’ll be here just three days from now. There’s going to be so much energy and it’s definitely going to be a night to remember. Everything seems to be ready and waiting for the games.

The question is now, are you ready?


Powered by SNworks Solutions by The State News
All Content © 2024 The Mercer Cluster, Mercer University